nottinghamshire-website2

Nottinghamshire Hospitals

Track Consulting was appointed in 2017 to undertake End of Defect Liability Period Surveys across two large scale hospital sites in the Mansfield area. Separated into five phases of work, based on the construction handover dates, Track will continue to undertake surveys and produce five separate reports between 2018 and 2021.

Prison in South Wales

Prison in South Wales

As part of a wider lifecycle management role, Track Consulting was appointed in 2013 to undertake annual condition surveys at a prison in South Wales. This annual survey continues to be undertaken, and is used to both update and improve the quality of the lifecycle model, and ensure the site is well managed and maintained.

Placeholder logo

Secure Training Centre

Track Consulting was appointed in 2016 to undertake a full-site condition survey of a secure training centre. Track’s survey team worked within this complex environment, to enable the successful production of a detailed report which can be used both to estimate works required, and to improve site maintenance.

derby-website

Derbyshire Hospital

Track was appointed in 2015 to undertake an End of Defect Liability Period Survey at a hospital in Derbyshire. Separated into nine phases of works, based on the various construction handover dates, Track will continue to undertake surveys and produce reports for the different phases between 2015 and 2020.

London-schools2

London Schools

Appointed in 2014, Track Consulting undertook End of Defect Liability Period Surveys across four school sites in the greater London area. Separated into two phases of work, based on the construction handover dates, Track undertook surveys and produced reports between 2014 and 2015.

westmidlands-website

West Midlands Hospital

Track Consulting was appointed in 2014 to undertake an End of Defects Liability Period Survey at a hospital in the Coventry area. Separated into a number of phases of work, based on the various construction handover dates, Track undertook surveys and produced reports for the different phases between 2015 and 2017. Track was also retained for the management of intrusive inspections, to further review identified issues.